Global Risk
FoxCast Forecast Ledger: The First Public Scorecard
A short public record of forecast questions, probabilities, deadlines, and scored outcomes.
Published 2026-05-28 · 3 min · For: FoxCast readers, operators, buyers, and strategy teams.
Most market commentary disappears after it is written.
This ledger is built to do the opposite. If a forecast has a probability, it should also have a deadline and a rule for what counts. When the outcome is known, it should be scored.
That does not mean every useful piece of analysis belongs in a scorecard. A supply-chain map can explain a bottleneck. A foresight note can describe a product category taking shape. A field-level agriculture post can show what pressure is forming. The ledger is narrower. It is for questions that can be checked later.
Active Forecasts
Agriculture: pasture stress
Question: Will U.S. pasture and range rated poor plus very poor reach at least 35% for two consecutive USDA Crop Progress reports before August 31?
- Current probability: 46%
- Information cutoff: 2026-05-21
- Deadline: 2026-08-31
- Status: Open
Agriculture: wheat production revision
Question: Will USDA lower its 2026/27 U.S. all-wheat production estimate by at least 3% from the May 2026 WASDE level before September 30?
- Current probability: 42%
- Information cutoff: 2026-05-21
- Deadline: 2026-09-30
- Status: Open
Agriculture / Global Risk: diesel cost pressure
Question: Will EIA U.S. on-highway diesel average at least $6.00 per gallon for four consecutive weekly reports before November 30?
- Current probability: 36%
- Information cutoff: 2026-05-21
- Deadline: 2026-11-30
- Status: Open
Global Risk / Macro: long-yield persistence
Question: Will the U.S. 10-year Treasury yield trade at least 25 basis points above its May 14 close for five consecutive trading days before July 31?
- Current probability: 37%
- Information cutoff: 2026-05-26
- Deadline: 2026-07-31
- Status: Open
Critical Minerals / Global Risk: rare-earth licensing posture
Question: Will U.S.-China rare-earth export-control or licensing posture materially change before November 10?
- Current probability: 31%
- Information cutoff: 2026-05-28
- Deadline: 2026-11-10
- Status: Open
Critical Minerals: non-China graphite qualification
Question: Will a named non-China graphite or anode supplier announce customer qualification or repeat commercial orders before year-end?
- Current probability: 28%
- Information cutoff: 2026-05-21
- Deadline: 2026-12-31
- Status: Open
What Changed
The main change is simple: these questions are now in public view.
That matters because the useful question is usually not "is this important?" It is more specific: what would have to happen, by what date, for this pressure to become real enough to change a decision?
For agriculture, the cleanest current questions are tied to pasture, wheat, and diesel. Those are not abstract macro themes. They affect feed planning, acreage assumptions, freight, harvest costs, and cash-flow pressure. If the thresholds are crossed, the result should be visible in public data, not just in a narrative.
For critical minerals, the better question is not whether China is important. That is already obvious. The better question is whether buyer-visible licensing, qualification, or order behavior changes. Capacity announcements are useful background. Customer qualification and repeat orders are stronger signals.
Resolved Forecasts
Global Risk: China purchase commitments
Forecast: China announces dated U.S. energy, farm-goods, aircraft, or industrial-purchase commitments within 30 days of the Trump-Xi Beijing meeting.
- Probability: 43%
- Outcome: Yes
- Brier score: 0.3249
Lesson: The useful distinction was dated commitments versus general cooperation language. A cautious forecast can still resolve yes when the artifact lands.
How To Read The Score
A Brier score grades a probability forecast after the outcome is known. Lower is better.
If a 70% forecast happens, that is a good result. If a 90% forecast does not happen, the miss should hurt. The point is not to sound certain. The point is to make uncertainty specific enough that it can be judged later.
Unresolved forecasts do not get Brier scores yet. They get a probability, a deadline, and an outcome rule. Once the event resolves, the record gets updated.
The public ledger will stay free. It is the accountability layer. Deeper memos can explain the pressure maps, watchlists, and what would change the view, but the basic record should be visible.
Original Substack version
This website page mirrors the published FoxCast Substack brief.
Share or cite
Copy a link, a short summary packet, or a citation line.